Start with the driveway, not the project
In Toronto, driveway space rules out more bin sizes than budget does. This is the step people skip, and it is the one that causes a cancelled delivery.
The ten feet everyone forgets
A roll-off bin does not get lowered straight down. The truck reverses in, tilts the bed up, and rolls the bin off backwards. That means you need the length of the bin plus roughly ten feet of clear space behind it for the truck to work.
A driveway that looks long enough for a 20 yard bin is frequently only long enough for a 14 once the tilt room is accounted for. Measure from the garage door to the sidewalk, not from the garage door to the bin's front edge.
What is above the driveway
Overhead obstructions stop as many deliveries as ground space does. The truck bed lifts high during the tilt, so the clearance you need is vertical as well as horizontal.
Things worth checking before booking:
- Low hydro or telephone lines crossing the drive.
- Mature tree branches overhanging the approach.
- A carport or garage overhang at the top of the drive.
- Second-storey balconies or bay windows above a narrow side drive.
Shared and mutual drives
Large parts of the older city (York, the Junction, parts of East York) have mutual drives shared between two houses. On those, a 10 yard bin is usually the realistic maximum, and it needs to sit entirely on your half.
If a bin will block a neighbour's access, sort that out before the delivery rather than after. A bin placed in a disputed spot cannot be moved by hand once it has weight in it.
Protecting the surface
Roll-offs are heavy, and Toronto asphalt softens considerably in July and August. Ask for boards to be placed under the bin when you book, which spreads the load. Interlock, freshly sealed asphalt and decorative concrete are worth mentioning specifically, because they need the placement planned rather than improvised on the day.
The four sizes and what fits in them
Once the driveway sets the ceiling, volume decides which size below that ceiling you need. Roll-offs are measured in cubic yards, and a useful conversion is that one pickup truck load is roughly three yards.
- 4 yard. About one pickup load. Concrete, soil, brick and tile, where weight fills the bin before volume does.
- 5 yard. About two pickup loads. More dirt, concrete, brick or asphalt than a 4 yard holds.
- 10 yard. About three pickup loads. The starting size for a single-room renovation or a garage clearout.
- 14 yard. About four pickup loads. A mid-size renovation or a full basement clearout.
- 16 yard. About five pickup loads. A kitchen plus flooring, or two rooms stripped in one week.
- 20 yard. About six pickup loads. Roofing tear-offs, estate clearances, deck and fence removals.
- 22 yard. About seven pickup loads. New builds, gut jobs and bulky, lightweight waste.
Some jobs reliably need more than people expect:
- A deck tear-out combined with a run of fencing.
- A full basement including old carpet and underlay.
- An above-ground pool with its surrounding deck.
- Any renovation that includes kitchen or bathroom cabinetry.
- A shed or play structure, which takes far more room dismantled than assembled.
Cabinetry is the classic underestimate. Kitchen carcasses are bulky, they do not stack, and they refuse to compact. A kitchen alone can fill a 14 yard bin before the flooring comes up.
Heavy material changes the answer
There is one situation where sizing up is the wrong instinct: dense material.
Soil, brick, concrete and asphalt are heavy relative to the space they occupy. A 22 yard bin filled with concrete cannot legally be moved, so heavy material is only booked into the 4 and 5 yard bins, which reach a safe weight before they reach the top rail. If your load is mostly:
- Soil, sod or clay from an excavation.
- Brick, block, concrete or patio stone.
- Asphalt from a driveway or path.
then a 4 or 5 yard bin is correct, even for a large job, and you may need more than one. Tile, plaster and roofing shingles are dense too, but they can go in the larger bins on weight-based pricing. Say what the material is when you book. Clean fill such as soil and concrete also goes to a different facility from mixed waste, so telling us in advance affects both the sizing and the disposal route.
The most common mixed case is a renovation that starts with demolition. Plaster and tile come out first and are dense, then cabinetry and framing follow and are bulky. Where the two phases are separated by a week or more, two smaller bins can genuinely beat one large one.
How long the bin can stay
The standard rental period is seven days, and longer terms are arranged when the bin is booked. On a renovation running several weeks, most people either take a longer term or arrange a swap, which keeps a bin on site throughout without a gap in the middle. If you finish early, a call brings the collection forward.
What you should not do is let the load rise above the top rail while you wait. A bin filled past the sides cannot be tarped, and an untarped load is not legal on the road, so it cannot be collected until it has been levelled.
What cannot go in the bin
The exclusions are the same regardless of size, and they exist because these materials need a licensed hazardous depot rather than a transfer station.
Not accepted in any bin:
- Paint, solvents, thinners and other liquid chemicals.
- Motor oil, fuel and propane tanks.
- Asbestos or suspected asbestos material.
- Car and marine batteries.
- Medical or biological waste.
- Ammunition, flares and explosives.
Asbestos is worth singling out. Pre-1990 Toronto houses can carry it in vermiculite insulation, floor tile, pipe wrap and textured ceilings. If demolition uncovers something suspect, stop and have it tested rather than filling a bin. Almost everything else that comes out of a house or a job site is fine, and our bin rental service takes mixed loads without sorting.
Permits: driveway versus road allowance
On your own driveway, no permit is required anywhere in the city.
On a City of Toronto road allowance (the street, the boulevard, or the curb lane) you need a street occupation permit, and the process and fee still differ between the former municipalities. That is a genuine delay rather than a formality.
Why this is worth checking early
A permit application is not something to discover on the morning of a delivery. Applications take time to process, and a bin that arrives without one can attract a bylaw notice within a day. Where a street placement is unavoidable, start the paperwork before you book the bin, not after.
The practical answer for most residential jobs is that it does fit, once the size is chosen with tilt room in mind. Where it genuinely does not, a crew-loaded junk removal visit does the same work with no placement problem and no permit at all.
Need a Bin in Toronto? Junk Alert Is Ready to Help
Send a photo of the driveway and tell us what is going in. We will tell you which size fits the space, which size fits the load, and which of the two is actually the constraint, before anything is booked or paid for.
Call us at (647) 905-8815 or contact us today to book a roll-off bin in Toronto and the surrounding areas.